MINI, Greenport Rotterdam (2024)
- Challenge: Daily client reporting on solar use, and an installation designed to blend into the event.
- Objective: Charge every MINI test vehicle on renewable energy while boosting a small grid connection. Up to 50 vehicles at a time, for six weeks.
- What we delivered: Bespoke charging infrastructure combining a 150 kWp solar array with 1,680 kWh of SmartGrid storage.
- Outcome: 31.5 MWh of solar energy generated and fully used on site. 6.3 MWh drawn from the grid connection for charging. The client called it “the smoothest power delivery they’ve ever had.”
- System: 150 kWp solar PV, 1,680 kWh SmartGrid.