- Challenge: Stadium grid connections had never been used to charge a battery on site, and the production team was used to running generators as standard.
- Objective: Cut power and energy associated emissions and prove that a tourable modular battery system could carry a stadium show and reliably replace traditional touring generators.
- What we delivered: A 1.25 MW / 1.68 MWh SmartGrid, charged from stadium mains power wherever available to cut generator runtime, otherwise generators charged the system.
- Outcome: Contributed to a 59% reduction in total tour emissions against the band’s previous tour. 80+ stadium deployments across 16 countries. Coldplay became the first stadium artist to perform on 100% emission-free on-site power at Wembley Stadium in London and Rogers Stadium in Toronto.
- System: 1.25 MW / 1.68 MWh SmartGrid. Generator backup.